Weekend Work 022 – Dates and Dashboards

Starting to use Dashboards is a major maturity step change within Power BI, it marks the change from using just Power BI Desktop to an integrated service based strategy.

The issue with DateTime is mentioned a lot on the forums, but often it doesn’t fully explain the why.

Weekend Work 021 – X and Beyond

After 20 weeks it was time to have a think about how things were progressing, we haven’t covered the X-functions in detail, so it was time for that and as far as Query Editor was concerned go and watch the other QE videos back, fluency is the key to Query Editor and that comes from usage.

Weekend Work 020 – Next Level

In the last two weeks we have looked at measures and the ETL process and parts of M in Query Editor, now it is time to start to look at the next level of this. Levelling up our queries both in DAX and M.